Q#1 Load Flow Analysis GATE EE 2025 MCQ +1 mark -0.33 marks

During a power failure, a domestic household uninterruptible power supply (UPS) supplies AC power to a limited number of lights and fans in various rooms. As per a Newton-Raphson load-flow formulation, the UPS would be represented as a

Slack bus

PV bus

PQ bus

PQV bus

Explanation:

During a power failure, the only power source is UPS. Since for convergence of load flow solution we need to declare one bus as Slack Bus and that bus needs to have power source. In our case only one bus has power source i.e. UPS and hence that bus needs to be treated as Slack Bus.

Browse Practice Questions by Chapters / Topics in Browse Practice Questions by Chapters / Topics in GATE Electrical Engineering
Total Questions

Attempted

% Attempted

Correct

% Correct

Topic Questions Attempted Correct
Network Analysis 208 0 0
Signals and Systems 21 0 0
Control Systems 18 0 0
Analog Electronics 10 0 0
Digital Electronics 138 0 0
Electrical Machines 17 0 0
Power Electronics 17 0 0
Power Systems 18 0 0
EMFT EE 8 0 0
Measurement 6 0 0
Engineering Mathematics 27 0 0
General Aptitude 104 0 0