Q#1 Fault Analysis GATE EE 2011 MCQ +2 marks -0.66 marks

Two generator units G1 and G2 are connected by 15kV line with a bus at the mid-point as shown below.

G1 = 250MVA, 15kV, positive sequence reactance X = 25% on its own base G2 = 100MVA, 15kV,  positive sequence reactance X for the line = 0.225

For the above system, the positive sequence diagram with the p.u. values of the 100MVA common base is

Explanation Locked!

Unlock this branch to view the explanation, track, bookmark and more.

Sign in to Unlock
Browse Practice Questions by Chapters / Topics in Browse Practice Questions by Chapters / Topics in GATE Electrical Engineering
Total Questions

Attempted

% Attempted

Correct

% Correct

Topic Questions Attempted Correct
Network Analysis 260 0 0
Signals and Systems 165 0 0
Control Systems 258 0 0
Analog Electronics 184 0 0
Digital Electronics 148 0 0
Electrical Machines 392 0 0
Power Electronics 237 0 0
Power Systems 344 0 0
EMFT EE 107 0 0
Measurement 158 0 0
Engineering Mathematics 225 0 0
General Aptitude 211 0 0