Loading...

Loading, please wait...

ExamDost
Learning Portal
Prep plan My packages

Practice over 1000+ GATE-level questions from this topic!

Designed to match the latest GATE pattern with topic-wise precision, difficulty tagging, and detailed solutions.

Q#1 Economic Load Dispatch GATE EE 2025 NAT +2 marks -0 marks

Two units, rated at 100 MW and 150 MW, are enabled for economic load dispatch. When the overall incremental cost is 10,000 Rs./MWh, the units are dispatched to 50 MW and 80 MW respectively. At an overall incremental cost of , the power output of the units are 80 MW and 92 MW, respectively. The total plant MW-output (without overloading any unit) at an overall incremental cost of  is __________ (round off to the nearest integer).

Sign in to see the solution

Log in to view the explanation, track your attempts, and keep your progress.

Sign in to Unlock
Browse Practice Questions by Chapters / Topics in Browse Practice Questions by Chapters / Topics in GATE Electrical Engineering
Total Questions

Attempted

% Attempted

Correct

% Correct

Topic Questions Attempted Correct
Network Analysis 260 0 0
Signals and Systems 165 0 0
Control Systems 258 0 0
Analog Electronics 184 0 0
Digital Electronics 148 0 0
Electrical Machines 392 0 0
Power Electronics 237 0 0
Power Systems 344 0 0
EMFT EE 107 0 0
Measurement 158 0 0
Engineering Mathematics 225 0 0
General Aptitude 211 0 0